Report Design
 Crystal Reports Forum : Crystal Reports 9 through 2022 : Report Design
Message Icon Topic: Custom Scheduling based on data in report Post Reply Post New Topic
Author Message
flazaro28
Newbie
Newbie


Joined: 30 Apr 2009
Location: Poland
Online Status: Offline
Posts: 35
Quote flazaro28 Replybullet Topic: Custom Scheduling based on data in report
    Posted: 23 Jun 2009 at 6:53am
I have a report which will be scheduled everyday. I like to set the condition to the scheduler such that if there is data on report during last 24 hours, then the report should be scheduled or else the report should fail or stop sending emails to users..

How can I implement this?
IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.016 seconds.