Joined: 04 Nov 2008
Location: South Africa
Online Status: Offline
Posts: 5
Topic: TIme Line Graph Posted: 03 Mar 2009 at 3:02am
Greetings,
I am struggling with a Crystal reports design issue and I am hoping that all of you gurus out there might be able to help me.
I need to create a graph displaying usage of industrial-type equipment over a time range. The graph should be something like a stacked bar chart but each bar needs to display multiple segments of the same colour.
For example, each piece of equipment can have the following usage types: idle, full production, half production, out of use. Usage could be: 08:00-09:00 out of use 09:00-10:00 idle 10:00-11:00 half-production 11:00-11:15 idle 11:15-12:00 half production 12:00-13:00 full production 13:00-14:00 half production 14:00-14:15 idle etc.
All of this needs to be displayed in a single bar per peice of equipment. The date range may span multiple day.
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum