Report Design
 Crystal Reports Forum : Crystal Reports 9 through 2022 : Report Design
Message Icon Topic: Adding Extra Points to a Chart Post Reply Post New Topic
Author Message
BobAloVskI
Newbie
Newbie
Avatar

Joined: 14 Mar 2012
Location: Australia
Online Status: Offline
Posts: 2
Quote BobAloVskI Replybullet Topic: Adding Extra Points to a Chart
    Posted: 14 Mar 2012 at 1:25pm
Hi All,

I am charting a simple level within a dam over time. This part is easy to do. However, they want to add predictive data to the chart so they can see what the level in the dam will be in three hours time (plotted every future hour) based off the change of level over last 3 hours.

How can I add this predictive data to the chart so that it continues the current line of the chart? Is this even possible?

I am using Crystal 2008 (12.3.0.601).

Robert
IP IP Logged
BobAloVskI
Newbie
Newbie
Avatar

Joined: 14 Mar 2012
Location: Australia
Online Status: Offline
Posts: 2
Quote BobAloVskI Replybullet Posted: 18 Mar 2012 at 3:44pm
I have not been able to find a solution to this. Instead I had to add the data to the database itself. Once the data is in there it is easy to get it onto the chart in the report.

It would have been nice if you could use an expression to write a data pair (value, time) to the chart and it plots it all for you. I guess that is not the case though.
IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.047 seconds.