Quote gloworm Replybullet Topic: Crystal Reports Server question
    Posted: 08 Oct 2012 at 8:46am
I need Crystal Reports Server help but did not see a specific area on the site for Crystal Reports Server questions.

I need to schedule a report to run only during specific hours of the day and at a set interval, like every two hours from 8am to 6pm.

I have looked through the user guide and it mentions using an event, but I do not see how to make the event do what I need it to do.  The event is supposed to limit whatever report I use it with to the hours I specify in the event, I believe.

Does anyone here have any idea on how to accomplish this, or have somewhere I may look as a resource?

IP IP Logged
Sastry
Moderator
Moderator
Avatar

Joined: 16 Jul 2012
Online Status: Offline
Posts: 537
Quote Sastry Replybullet Posted: 08 Oct 2012 at 6:49pm
Hi
 
I heard that there is a File based event, it is something like, you create a text file in your server, and create a file based event. It always check for change or update in the file. When it finds any change, the event get fired.
Look for File based event in BO Admin Guide.
Note : this even procedure is same for CR / BO server.
Thanks,
Sastry
IP IP Logged
hilfy
Admin Group
Admin Group
Avatar

Joined: 20 Nov 2006
Online Status: Offline
Posts: 3702
Quote hilfy Replybullet Posted: 09 Oct 2012 at 10:18am
I'm afraid that an event won't really help you solve this problem.  The only way to do this, unfortunately, is to create a recurring schedule for each time a report report will run.  For example, if you need the report to run at 8 am, 10 am, 12 noon, etc. Monday through Friday you'll schedule like this:
 
Weekly: Mon, Tue, Wed, Thur, Fri
Time: 8 am
 
You'll have another schedule for 10 am, one for 12 noon, etc.
 
-Dell
IP IP Logged
gloworm
Groupie
Groupie


Joined: 10 Oct 2011
Online Status: Offline
Posts: 47
Quote gloworm Replybullet Posted: 09 Oct 2012 at 10:33am
Originally posted by hilfy

I'm afraid that an event won't really help you solve this problem.  The only way to do this, unfortunately, is to create a recurring schedule for each time a report report will run.  For example, if you need the report to run at 8 am, 10 am, 12 noon, etc. Monday through Friday you'll schedule like this:
 
Weekly: Mon, Tue, Wed, Thur, Fri
Time: 8 am
 
You'll have another schedule for 10 am, one for 12 noon, etc.
 
-Dell



Is there a way to duplicate the first schedule for 8am multiple times and just change the time of the copied ones?  That way I dont have to create brand new schedules for each instance.
IP IP Logged
hilfy
Admin Group
Admin Group
Avatar

Joined: 20 Nov 2006
Online Status: Offline
Posts: 3702
Quote hilfy Replybullet Posted: 09 Oct 2012 at 10:57am
Yes, you can.  If you're in InfoView, Right-click on the scheduled instance and click on Reschedule.  If you're in the CMC, select the instance, click on the Actions menu (it might be Manage, but I'm pretty sure it's Actions) and select Reschedule.
 
Change the time and be sure to turn off the option to overwrite the existing schedule.
 
-Dell
IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.047 seconds.