Report Design
 Crystal Reports Forum : Crystal Reports 9 through 2022 : Report Design
Message Icon Topic: Crystal Reports Date Post Reply Post New Topic
Author Message
cheesepie2k7
Newbie
Newbie
Avatar

Joined: 11 Mar 2008
Location: United Kingdom
Online Status: Offline
Posts: 2
Quote cheesepie2k7 Replybullet Topic: Crystal Reports Date
    Posted: 11 Mar 2008 at 8:27am
Hi,

I am pretty new to Crystal Reports.

I am building a report which gets its data from a Stored Procedure.

Its all working except for one thing:

The DATES are coming up 'random' i.e. In the database the date says the 6th February, but it is being output as the 5th of February. It does it with all the dates and ranges from 1 - 5 days.

When I check the Stored Procedure in SQL Studio Express, it returns the correct date.

Has anyone had a problem with this before? If so, how did you fix it?

Thanks,
William
IP IP Logged
BrianBischof
Admin Group
Admin Group
Avatar

Joined: 09 Nov 2006
Online Status: Offline
Posts: 2458
Quote BrianBischof Replybullet Posted: 11 Mar 2008 at 10:50am
I haven't seen that before. Is the date format that SQL using non-standard or something different than the default?
Please support the forum! Tell others by linking to it on your blog or website:<a href="http://www.crystalreportsbook.com/forum/">Crystal Reports Forum</a>
IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.031 seconds.