Quote CR_ants Replybullet Topic: seperating graph values
    Posted: 24 Apr 2014 at 10:07am
Hello,

I'm fairly new to Crystal Report and currently stuck!

I have a bunch of values which have been grouped by job number and then by date.

i.e.

Job#1
   week1
   week2
   week3
Job#2
   week1
   week2
   week3

and etc...

This worked well, but now, what I see in my graphs, are all the values that happened that week. So, for week 1 I'll have 3 bell curves, week 2 i'll have 10 bell curves.

What I want is to seperate these bell curves into seperate graphs. So, i will have 1 bell curve between this time and another and in another graph I'll have another bell curve with a different date range.

I tried formulas and group expert but not getting the results that I want. There is a 3rd value where it goes from 0 to 150 and then back to zero (which gives the full cycle of the bell curve) I tried using that but I get errors or just the bells curves without spaces.

I can NOT do by date range because the hours/date vary too much.

I look forward to hearing from you guys! Hope you can help!

Thank you in advance!

Anthony
Never spit on a mans moustache unless it's on fire.
IP IP Logged
Sastry
Moderator
Moderator
Avatar

Joined: 16 Jul 2012
Online Status: Offline
Posts: 537
Quote Sastry Replybullet Posted: 27 Apr 2014 at 1:16am
Hi Anthony
Where you placed your graph ? i.e. in which section gaph was included.
 
Can you drag the group to Job Group and see the results.
 
-Sastry
Thanks,
Sastry
IP IP Logged
CR_ants
Newbie
Newbie
Avatar

Joined: 24 Apr 2014
Location: Canada
Online Status: Offline
Posts: 3
Quote CR_ants Replybullet Posted: 28 Apr 2014 at 2:09am
Hey Sastry,

My graphs are located Under Jobs > Date&Time (which is by week) groups.

I can't drag the graph into jobs because the jobs will weeks of bell curves.

I would like to add another group (a sub group of date&Time) which will seperate my bell curves into their individual graphs.

Anthony
Never spit on a mans moustache unless it's on fire.
IP IP Logged
CR_ants
Newbie
Newbie
Avatar

Joined: 24 Apr 2014
Location: Canada
Online Status: Offline
Posts: 3
Quote CR_ants Replybullet Posted: 28 Apr 2014 at 3:51am
no idea how to insert an image from my desktop? I can send you the pic...

here's an example of what my graphs look like. Would like to have a graph for each "bell curve", the pink lines are that 3rd value that I was talking about.

Thank you,

Anthony


Edited by CR_ants - 28 Apr 2014 at 3:53am
Never spit on a mans moustache unless it's on fire.
IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.016 seconds.